NEWS

News

Installation instructions for aluminum stage truss light hanger for theater gymnasium

Day: 2021-07-07
Click: 11

As the fixed lighting hanger equipment of the gymnasium, its stability is mainly considered, and the hoisting method of the lighting truss hanger greatly affects its firmness, bearing capacity, etc., so we must adopt the correct way of hoisting the lighting rack The installation method, see the figure below:


Installation instructions for aluminum stage truss light hanger for theater gymnasium


After the lighting hanger completes the safe hoisting method, we must consider the stability of the lighting equipment and the possibility of use. Too few equipment can not meet the needs of users, too much equipment, and complicated disassembly and assembly not only increase the labor of the user. It will also bring unnecessary losses to the stage. According to the requirements for theaters and gymnasiums in the 'Theatre Architectural Design Code' (JGJ 57-88), it must also meet the performance needs of small and medium-sized performance groups. The design idea is: Sophisticated, stable, moderate and provide high-use equipment.


 System composition


The stage lighting system is mainly composed of power distribution system, control system, silicon cabinet, lamps and stage auxiliary equipment. The layout of the stage lighting mainly meets the lighting needs of the performance, including side light, top light, backlight, background light and other parts. The lighting uses 1KW film and television return light, 1.25KW heaven and earth row light, and 1.25KW secondary reflection soft light. Lights, LED downlights (color changeable), 575 computer moving head pattern lights and other different types of conventional and lamps cooperate with each other, and the light frame adopts ROYAL KAY EQUIPMENT. The light is composed of three basic lights of red, green and blue. Make it release colorful colors, set off a variety of effects and artistic modeling.



Facing part:


According to standard theater specifications, it is necessary to set up face light, and face light and slap light are the main lights on the stage. However, it is impossible to build a face light bridge and a slap room according to the actual construction situation of the gymnasium. This plan combines the actual characteristics. The face light part is mainly in the front of the stage, and a 1KW film and television return light is set as the face light of the characters.


Top light part:


A top light is installed above the stage, and 1.25KW secondary reflection soft light and 575 computer moving head pattern light are installed on it. During performances or meetings, the entire stage is covered by secondary reflection soft light.


Side light part:


The side light is mainly to highlight the outline and pave the scene on the stage, making it more distinct. The side light part has a fixed bridge light, which is generally symmetrical. The side-light lamps are installed on the side-light lamp stands above the two sides of the stage, using LED downlights (color changeable).


Backlight part:


Backlighting provides full levels and three-dimensionality for stage performances, and is also the main component of stage colors. We set up two backlights, installed above the back area of the stage, and installed LED downlights (color changeable). The main purpose is to make various color changes and action modeling during the performance.


Backlight:


The background light is the main lighting of the stage background, which can highlight the effect of the stage, and can also render the atmosphere of the performance by changing the color. We set up a sky curtain and a row of lights in the sky and on the ground in the back area of the stage.


Tag: aluminum alloy truss, stage lighting frame, event assembled stage, truss frame


HOT SALE / Products More
  • 发布时间: 2017 - 02 - 28
    Advantage of upgrading to Pipe & Drape 2.0 1.The most obvious advantage is the instant damage mitigation. You will never again have a tear in your upright due to the hook acting like a can opener down your slotted upright.This alone reduces your replacement costs, and reduces the risk of injury due to cuts and scrapes on those tears. 2.Faster set up and take down times (as much as 30% time savings on every job) 3.More set up flexibility due to greater articulation in all directions with our exclusive patent pending ball and socket connection. 4.Greater stability due to ...
  • 发布时间: 2015 - 09 - 30
    Product Name:PleucheGrams:250g/㎡Width:160cmComponent:100% Polyester Application:stage curtains,wedding backdrop decoration,stage skirt,pipe and drape curtain Package:①Interior packing:plastic film②Outer packing:Carton (Depending on clients' request which can be customized) Features:Fire-Retardant,full toughness,cheaper price,soft surface.
  • 发布时间: 2022 - 03 - 17
    Span width:3m/4m/5m/6m/7m/8m/9m/10mSide height :2.5m Ridge height :4.2m/4.8m/5.4m/5.9m/6m/6m/6.1m/6.3mRoofpitch:18°/22°Bay distance: 3m/4m/5m/6m/7m/8m/9m/10mLongest component:3.1m/4.1m/5.1m/6.1m/3.7m/4.2m/4.7m/5.3m Minimum length: 3m/4m/5m/6m/7m/8m/9m/10mMaximum length: No limited Main profile: 65X65X3mm 3 groove/122X68X3mm 4 grooveFrame material:High reinforced aluminum alloy GB/T-6063 T5/GB/T-6061 T6 Fabric material: PVC-coated polyester textile,630-950g/M2weight,flame retardant toDIN4102 B1,M2Max.Allowed windspeed:80km/hour fresh gale w...
  • 发布时间: 2021 - 12 - 10
    Fencing size:1780x2400mm  (70''x95'')Top & bottom horizontal pipe:40x40mm (1.57''x1.57'') square Side Post:40x40mm (1.57''x1.57'')  squareVertical Pipe: 20x20mm (0.79''x0.79'') squarePipe spacing:150mm (6'')Extra horizontal pipe:40x40mm (1.57''x1.57'');10'' from top rail.Base:450x600mm(18''x24''), 50*50mm(2''x2'') square tube,with 2 inter uprights (300mm high)  Surface:Hot-dip galvanized pipe welding,paint black
  • 发布时间: 2017 - 12 - 23
    Pipe and Drape 2.0 for Sale: Adjustable Uprights, Drape Support Rods (Crossbars), Steel Bases, and Rubber Weights. Pipe and Drape 2.0 systems and DIY parts are available to upgrade your current pipe and drape kits. Black powder coated finishes available or custom made pole socks to hide your hardware. Bulk order discounts and Pipe and Drape Wholesale available. Extra long and tall pipe and drape systems available, but please contact us for special freight delivery arrangements.
  • 发布时间: 2017 - 12 - 21
    The 2 Stage Crown is available for the most popular upright sizes in the market. This makes the conversion of your inventory one of the easiest upgrades ever.Simply remove or repair the damaged end of your uprights and secure 3 Stage Crowns.2 Stage Crowns must be used in conjunction with Pipe & Drape 2.0 Ball Caps.Longer using life.
  • 发布时间: 2017 - 12 - 21
    More stable than traditional pipe and drape.Supports drape support rods with ball cap ends ONLY. 1/4" threaded insert is built into top center to mount cameras, lights, speakers, etc via steel mounting posts.
  • 发布时间: 2017 - 12 - 21
    Allowing a full range of motion for cross bars, the Ball Caps play a major role in time savings and flexibility during set up. Made from a virtually indestructible nylon compound molded around a steel stud, the Ball Cap distributes forces evenly through precisely engineered webbing.More stable solution than traditional pipe and drape. Better center of gravity for crossbars.Rounded ball-cap end prevents damage to pipes, drapes, banners, signs, vehicles, and your hands!Upgrades take (2) minutes via muli-grip, pop rivets.
Tel: 86-157-1080-3347 Online Message Fax: 86-755-61628226 Huatong Building NO.2127 Sungang Road Shenzhen China 
 
ELEVATE YOUR EXPERIENCE
  • *
  • *
  • *
  • *
Copyright ©2005 - 2022 Royal Kay Performance Equipment 
犀牛云提供企业云服务


X
1

QQ设置

3

SKYPE 设置

4

阿里旺旺设置

2

MSN设置

5

电话号码管理

6

二维码管理

8

邮箱管理

展开